Port of Baku

Ship Repair Facility

In our plans for Port of Baku there is a Shipyard Facility concept, which is intended to function in the New Port at Alyat. The early conceptual design comprises of the following functions:

  • New-build facility with New-build hall;
  • Outdoor repair facility with associated workshops;
  • Ship-lift;
  • Indoor temporary blasting and painting facility’
  • Transfer area;
  • Container storage;
  • Fabrication area;
  • Office buildings (and parking spaces).

The availability of such a Shipyard Facility would provide an internal synergy by being able to service the tugs and other service boats in order to maximise the productivity of our assets and hasten the major repair processes.

 

 

Green port

Port of Baku is not only targeting economic interests. We believe that when the economy and ecology work hand-in-hand, much greater work efficiency can be achieved. Aiming to become the most environmentally friendly port in the region, the Port will operate in...

READ MORE

Here you will find the history of the port since 1564...